top of page

The Budget

2018

The following Budget Estimate represents the total costs involved in the production of this piece, including all materials, subcontractors and equipment. It even includes labor costs so that those involved in the construction can actually get paid. We've got a short time period to complete fabrication, and using volunteers just wouldn't get it done in time. You can download it to your computer using the link, or just look at the printout. The spreadsheet is for the Whole Phase Two Enchilada.

skulltrackbudget smaller.jpg

Funding link:

 https://www.dwjh.org/donate

bottom of page